Moving your website and email to Traxio without downtime

The order to follow when bringing an existing site and mailboxes to Traxio so visitors and email never see a gap.

Guide2 min readLast updated
On this page
  1. 1. Prepare (a day or more before)
  2. 2. Copy the website
  3. 3. Test on Traxio before DNS changes
  4. 4. Recreate email
  5. 5. Switch DNS
  6. 6. Move old email
  7. 7. Confirm, then cancel the old host
  8. Common questions

The secret of a no-downtime move: build everything on Traxio first, switch DNS last, and cancel the old host only after the switch is complete.

1. Prepare (a day or more before)

  • Lower the TTL on your domain’s records at the current DNS provider to 300 seconds. What is TTL in DNS?
  • List every mailbox and forwarder, and every custom DNS record (MX, TXT verifications, subdomains).
  • If DNSSEC is on, turn it off first. What is DNSSEC?

2. Copy the website

3. Test on Traxio before DNS changes

Use your computer’s hosts file to view the Traxio copy. Previewing your site on Traxio before changing DNS Check pages, logins, forms and anything that sends email.

4. Recreate email

Create the same mailboxes and forwarders in DirectAdmin. How to create an email account in DirectAdmin Use the same passwords temporarily if that makes the switch smoother, then change them.

5. Switch DNS

Change nameservers to Traxio (How to point your domain to Traxio (change nameservers)), or update A and MX records at your DNS provider. Recreate any custom records at Traxio first.

6. Move old email

After the switch, new mail arrives at Traxio. To bring old messages across, add both the old and new mailboxes to a desktop email app over IMAP and drag folders from old to new. Your old host must still be active, and you may need its server address rather than your domain, since the domain now points to Traxio.

7. Confirm, then cancel the old host

Then cancel the old hosting, keeping a final backup.

Prefer to follow along?

Common questions

How do I move my website to Traxio from another host?

Build and test the site on Traxio first while the old host keeps serving visitors, then switch the domain’s nameservers last. Done in that order, nobody sees downtime.

The general sequence for any site:

  1. Set up the Traxio account and upload the files (or install WordPress).
  2. Import the database if the site has one.
  3. Preview the site on Traxio before touching DNS.
  4. Recreate your email addresses, if you host email with your web host.
  5. Switch nameservers, and leave the old hosting running for a week.

Cancelling the old hosting immediately is the one mistake that makes a migration painful.